021 300 8720
support@imageon.co.za

What is coverage and how does it determine the price of embroidery

04, November 2025

Embroidery coverage and it's effect on pricing and time

When we talk about coverage, we're really talking about the percentage of the design that is actual embroidery and what is left untouched by the threads and stitches. This along with the size, determines how long it will take to embroider, and hence the price charged. Now there are other items that add to the cost, for example backing, speciality threads and any additional steps needed to attach it to an item of clothing or material. For this article we'll focus on number of stitches in a design and coverage.
The process is typically measured by determining the number of stiches in a design and dividing that by stitches per minute that our embroidery machines can comfortably maintain. Some embroidery machines are rated to reach 1200 stitches per minute. And designs being anywhere between 120 to 360 stitches per CM2, we work on the average of 265. So you can see how stitches can vary greatly depending on the size of the design, how much of the design is a solid area, and how much of it is just an empty space where the fabric behind it is visible.

Machine speed

Industrial or commercial embroidery machines have stated speeds of 1200+ stitches per minute, however for a better output and longevity of the machine, we typically stitch out at between 600 and 800 stitches per minute. Fabric moves, is flexible and if the machine moves too quickly this can effect accurate placement of the design. Also we treat our embroidery machines just like any other piece of expensive machinery, where pushing it to it's limit all the time is never a good idea.

Let's look at an example design.

embroidered patch example showing flowers
This patch is 7cm x 7cm when embroidered, we know that a circle covered approximately 73% of the area. a little math says 7 x 7 = 49. then we look for 73% of 49, therefore 49 x 0.73, equals 35.77.
So this design is 35.77 CM2, or for simplicity we'll round up to 36CM2
We estimate basic embroidery to be around 265 stitches per Square Centimetre, which works out to 36 x 265 = 9540 stitches. This is what our online estimator works on, 265 stitches per CM2

Here's where things get interesting and why we used this example above.

The actual stitch count for this design is 17970 stitches! So we have to ask why on earth is it so much more than we would assume? This all boils down to how variable a design can be, you see on this design the complex fill of the black background is embossed, requiring multiple passes on the same area, has a very tight stitch ( the space between rows of stitches ), the thicker border around it goes over an already embroidered area, the flowers have complex fills, tight stitches and also go over an already filled background.

Let's run through the stitches that make up this design

First we have the underlay

This is the stitch that secures fabric and stabiliser under the design so that there is minimal movement of the material.
embroidered patch underlay
So far we have 1200~ stitches

Then the background or fill stitch is layed down

embroidered patch Finally
Now we up to 10400~ stitches, we can see this fill stitch with its 0.4mm spacing uses allot of stitches.

Next is the flower design

embroidered patch no border
Now we up to 16500~ stiches

Finally the border or appliqué stitch to complete the patch

embroidered patch example showing flowers complete
Now we up to 17970 stitches, again lots of stitches. This process on a machine set to 600 Stitches per minutes would take around 30 minutes for the stitch out, plus about 5 minutes for setting the backing and item, plus 5 minutes for clean up, and applying any backing it might need. Quite a labour of love. Luckily when you have multiple machines you can produce quite a number of these at a time, but it's still takes up more time than most would assume.

What can be done to reduce the stitch count and speed up the embroidery process?

Increase the machine speed to it's full speed, 1200.
The most obvious answer would be to increase the machine speed to it's full speed, 1200. But then we run the risk of higher machine wear and tear, more risk of thread breakage, broken needles, and the vibration of the fabric would cause slight misalignment of the designs. So this is not first prise for us. We will keep it between 600 and 800.
Make the design stitches less dense
This is really the only way to save on the cost of embroidery if your design is set, and no removal of elements (background fills) can be done. We could design the fills and flowers to have a lower density, you might then see a bit of the fabric color seeping through the thread, the look of the design will change slightly, if the client is happy with this, then it is an option. Doing this brings the stitch count down from 17970 to 13807, 23 minutes compared to 30 minutes.
embroidered patch example showing flowers 0.6mm stitch density
Doesn't look too bad, let's zoom in a bit to see some details, note these are from the digitising software so they represent the stitch out.
embroidered patch 0.6mm density embroidered patch 0.6mm density
We notice some additional spacing, on the leaves and petals, and the background fill is less embossed.
Remove hidden stitches or excessive overlap where you can.
If we can, we will removes stitches that are overlapping other filled area and not seen, for example the area under the flowers and petal is not seen and could be removed to save on time and cost. however this doesn't save that much, on this design it saved around 600 stitches or 1 minute, In this case we would leave them in. Removing complex shapes from a fill, then requires more stich runs, so in this case, the saving isn't worth it. Removing stitches means less layers. Layers gives the design height in areas and a beautiful texture.
Simplifying the Design
In our example we have a patch, which would normally require a background, now this could be removed and we could use a material as the backing to save on cost slightly. But for other designs, removing backgrounds, creating simpler stitch types and lengths are all options. It all comes down to the look and feel of the embroidery that you want. And what the material you are placing your design on, can handle.
Reduce the size of the embroidery
If you are happy with reducing the size of the embroidery this can save on stitches in an exponential way, For example this patch which is 7cm x 7cm give us over 17,000 stitches, reducing it to 6cm x 6cm would make it around 12500 stitches, reduce further to 5cm diameter and we get around 8700 stitches.
Incorporate fabric fills
Fabric instead of the background fill will reduce the stitch count by 50% and the cost by about 30%, this is how most badges and patches are done to keep things in budget.

So how do we determine the price we will charge for a job?

The base cost comes from time it takes to stitch out a design; this is size of embroidery, amount of the space that is covered by stitches, and then layers of stitches. Also we keep in mind the cost of backing, machine wear and tear ( each machine has a finite lifespan before it's too worn-out to be reliable or repaired ), and labour for clean-up, placement, applying additional backing etc.